The optimization and model test research on the spillway of long-men reservoir
The terrain and geological condition of spillway of long-men reservoir is complex, through combing theory design with model test, combing geological drilling with geological working in construction stage, the arrangement and design scheme of the spillway was optimized. Through using proper temperature controlling measures, temperature crack of the concrete was prevented, so the integrality and endurance of the structure was ensured. Water was stored as soon as the project was finished. In the end, the project exerted a huge economic and society benefit.
long-men reservoir spillway optimization design model test
Shu-Yu Liu Yu-Min Qiao Chuan-Jin Che