The optimization and model test research on the spillway of long-men reservoir

The terrain and geological condition of spillway of long-men reservoir is complex, through combing theory design with model test, combing geological drilling with geological working in construction stage, the arrangement and design scheme of the spillway was optimized. Through using proper temperature controlling measures, temperature crack of the concrete was prevented, so the integrality and endurance of the structure was ensured. Water was stored as soon as the project was finished. In the end, the project exerted a huge economic and society benefit.

long-men reservoir spillway optimization design model test

Shu-Yu Liu Yu-Min Qiao Chuan-Jin Che

Hebei Provincial Second Investigation, Design and Research Institute Water Conservancy and Hydroelec Hebei Provincial Second Investigation, Design and Research InstituteWater Conservancy and Hydroelect

国际会议

2005年大坝安全与堤坝隐患探测国际学术研讨会(International Symposium on Dam Safety and Detection of Hidden Troubles of Dams and Dikes)

西安

英文

1-12

2005-11-01(万方平台首次上网日期,不代表论文的发表时间)