Rehabilitation of Asphalt Concrete Facing in Nangudong Reservoir
The asphalt concrete facing of Nangudong reservoir has serious problems of flow-up and cracking, which must be rehabilitated. In the rehabilitation, the optimum mix is adopted, a mixing plant for producing road asphalt mix is modified to produce qualified hydro asphalt mix. The advanced finisher LMP-3 is used to place asphalt mix, LMP-3 has pre-compaction function, which could ensure construction quality. The inspection results demonstrate that the asphalt concrete quality in Nangudong Reservoir’s rehabilitation is very good. Construction techniques and experiences in this project could be used in other similar project rehabilitation.
asphalt concrete impervious facing mizing plant finisher placing joint treatment
Yue yuezhen Hao jutao Lu Yihui Liu zenghong
China Institute of Water Resources and Hydropower Research
国际会议
西安
英文
1-16
2005-11-01(万方平台首次上网日期,不代表论文的发表时间)