会议专题

About Application of New Concrete Crack Management Material and Craftwork in Kalangguer Reservoir

The important topic for concrete construction at present is to prevent and decrease concrete crack, which is one of technology problems that the dam industry pays the most attention to; the key reason for panel crack is relative with local climate, concrete structure design and construction technology level. If concrete is used, don’t avoid crack; it is necessary for ensuring dam safety with operation and management how to deal with crack and which material and method can be used for appropriate crack management. We mainly introduce, according to the engineering, Kalangguer reservoir boldly adopts new waterproof and craftwork to deal with the crack produced from concrete, which has better effect and is worth being referred by the same industry and same kind of dams.

Nan Kangning

The 2nd Engineering Company of the 15th Engineering Bureau of China Sinohydro Construction Group

国际会议

2005年大坝安全与堤坝隐患探测国际学术研讨会(International Symposium on Dam Safety and Detection of Hidden Troubles of Dams and Dikes)

西安

英文

1-7

2005-11-01(万方平台首次上网日期,不代表论文的发表时间)