Preliminary Study of Decommissioning Assessment of Dam and River Restoration
Some hydraulic and hydropower engineering structures have serious defects and hidden faults or malfunction. The USA and other countries from Europe have introduced advanced theories and methods that can be used to solve these problems by assessing the physical conditions of the dam. A study on the evaluation of the retirement of dams was conducted by adapting the theories to Chinese conditions. A preliminary appraisal is done to characterize the physical conditions and the process for the retirement of dam and ecological restoration of the stream (on which the dam was built). In this paper, the theory, method and technology for the retirement of dams is discussed as well as the interrelation with other areas such as hydraulic structures, hydro-hydraulics, mathematics, technological economy, environmental engineering etc.
large dam life span retirement assessment removing dam ecological restoration
Xiang Yan He Yongjun Fu Zhimin
Nanjing Hydraulic Research Institute, Dam Safety Management Center of MWR, Nanjing, Jiangsu, 210029, Civil Engineering Institute of Hehai University, Nanjing, Jiangsu, 210098, China
国际会议
西安
英文
1-19
2005-11-01(万方平台首次上网日期,不代表论文的发表时间)