会议专题

Operation of the GTS-LHC Source for the Hadron Injector at CERN

The GTS-LHC ion source,designed and build by CEA Grenoble,was installed and commissioned at CERN in 2005.Since than the source has delivered oxygen and lead ion beams (O4+ and Pb27+ from the source,Pb54+ from the linac)for the commissioning of the Low Energy Ion Ring(LEIR).Results of this operation and attempts to improve the source performance and reliability,and the linac performance will be presented in this paper.

operation linear accelerator metal ions bias disk

L.Dumas C.Hill D.Hitz D.Küchler C.Mastrostefano M.ONeil R.Scrivens

国际会议

The 17th International Workshop on ECR Ion Sources and Their Application(第17届国际ECR离子源研讨会)

兰州

英文

51-54

2006-09-17(万方平台首次上网日期,不代表论文的发表时间)