会议专题

Status of the 2Q-LEBT Facility at ANL

The concept for a 2 charge state injector for a RIA type accelerator has been presented.Progress toward an operational prototype 2Q-LEBT system at Argonne National Laboratory(ANL)is under way.The existing BIE 100 all permanent magnet ECR has been placed on a high voltage platform capable of a combined>100kV with q/m separation at ground level.Remote control of the devices on the platform has been implemented.Other components of the facility are currently being tested.The components of an achromatic bending system are currently being procured.This paper will present recent work at the facility as well as preliminary development of solid materials using the BIE 100.

ECR ion source multi charge LEBT

R.H.Scott V.N.Asseev T.V.Kulevoy P.N.0stroumov E.A.Poklonskaya M.Sengupta N.E.Vinogradov

国际会议

The 17th International Workshop on ECR Ion Sources and Their Application(第17届国际ECR离子源研讨会)

兰州

英文

111-114

2006-09-17(万方平台首次上网日期,不代表论文的发表时间)