Application of EM Algorithm to Flowshop Scheduling Problems with a Special Blocking
We introduce a scheduling problem – a flowshop problem with blocking—which we label with the acronym RCb (Release When Completing Blocking), which is prevalent in certain industrial environments. We apply the metaheuristic Electromagnetism-like mechanism (EM) for solving it. The heuristic EM simulates the attraction-repulsion of the charges, and makes solutions move to the optimality without being trapped into local optima. We have secured computational results using EM and compared them to other procedures to demonstrate the superiority of the EM procedure under certain conditions.
Scheduling Flowshop Metaheuristic Electromagnetism-like Mechanism
Yuan KUN France Nathalie SAUER France
Laboratoire de Génie Industriel et de Production Mécanique,Université Paul Verlaine-Metz Ile du Saulcy,57045 Metz Cedex 1
国际会议
北京
英文
2007-05-30(万方平台首次上网日期,不代表论文的发表时间)