会议专题

Dynamic Network Construction for Job-Shop Scheduling Systems

Although some researchers have proposed the dynamic model for the job-shop scheduling system, the inclusion of uncertainties and evidence into the model is still uncommon. In this paper, we proposed a novel approach in solving the jobshop scheduling system based on decision theory. The objective of this research is to develop a job-shop scheduling system that is reactive, usable, effective, and robust. In this paper, proactive and reactive approaches, the two approaches in solving the dynamic job-shop problems, are combined into one integrated model. Formal definition and solution algorithm for the dynamic job-shop problem are presented. Our approach can accommodate the uncertainties and evidence of the shop-floor. Reducing into deterministic one, the algorithm has been successfully applied to some job-shop problems with minimizing makespan as the objective function.

scheduling decision analysis dynamic job-shop Bayesian network influence diagram

Nur Aini MASRUROH Kim Leng POH

Department of Industrial & Systems Engineering,National University of Singapore,10 Kent Ridge Crescent,Singapore 119260

国际会议

工业工程与系统管理2007年国际会议(International Conference on Industrial Engineering and Systems Management)(IESM 2007)

北京

英文

2007-05-30(万方平台首次上网日期,不代表论文的发表时间)