Research on Water Inventory Control Model of South-to-North Transfer Supply Chain

In South-to-North Water Transfer Project, how to allocate and transfer the limited project water is a problem needed to solve urgently. Water inventory control of the lakes along the Project is an important research in the operation management of the Project. This study introduced the theory of product inventory control of SCM into water inventory control of the lakes. When the flood was considered, it established centralized, independent and VMI control models of water inventory. Then it deduced optimal water order quantity and profit models of the lake under different control policies. Finally, by comparing the effect of independent and VMI control policies, it gains the conclusion that the implementation of VMI policy can steadily enhance the profits of the node lake and the whole water supply chain but that the increase of the profit of the pumping mouth at the Changjiang River is not guaranteed. Furthermore, it validated the conclusions by simulation testing.

Supply Chain Management South-to-North Water Transfer Project Water Inventory Control Vender Management Inventory (VMI)

X.Y.TAO

Economics & Management School,Zhongyuan University of Technology,Zhengzhou,P.R.China

国际会议

工业工程与系统管理2007年国际会议(International Conference on Industrial Engineering and Systems Management)(IESM 2007)

北京

英文

2007-05-30(万方平台首次上网日期,不代表论文的发表时间)