Electromagnetism-Like Mechanism Algorithm For Stochastic Assembly Line Balancing With Reliability Constant
This paper deals with the assembly line balancing problem with independent stochastic operation times. The problem consists of assigning operations to a given number of workstations in order to minimize the cycle time while all precedence constraints between operations are met and the probability of exceeding the cycle time is smaller than a given ratio. A new electromagnetism-like mechanism (EM) algorithm is proposed to solve the line balancing problem. EM simulates the electromagnetism theory by considering each solution as an electrical charge. Through the attraction-repulsion of the charges, solutions move to the optimality. The numerical results are compared with those of simulation annealing (SA) and EM show better performance of SA for this kind of problem.
Production Assembly line balancing Reliability EM
Liya GU Alexandru SAVA Sophie HENNEQUIN Xiaolan XIE
LGIPM,ENIM,Ile du Saulcy,57045 Metz Cedex 1 Ecole des Mines de St Etiennes,158,cours Fauriel 42023 Saint-Etienne cedex 2 France
国际会议
北京
英文
2007-05-30(万方平台首次上网日期,不代表论文的发表时间)