会议专题

Scheduling Operating Theatre under Human Resources Constraints

In the approach of considering human resources’ preferences in the scheduling of activities, we present in this paper a contribution on the optimization of operating theatre scheduling. The operating theatre is considered as the most resources consuming unit of the hospital; its management is therefore of primary interest since an ecient planning can reduce human and financial working costs. In the pursued optic, we stress here the human resources’ availabilities by, among others, allowing renewable resources like nurses or anaesthetists to leave an operation in progress. We propose in this paper a mixed integer programming and a genetic algorithm to solve the operating theatre problem, both these approaches combining surgeries planning and scheduling. The genetic procedure, which solves the problem heuristically, is the consequence of the large running times that may characterize the exact solving method.

Scheduling healthcare management linear programming genetic algorithm

Benoit ROLAND Christine DI MARTINELLY Fouad RIANE Yves POCHET

Facult(e)s Universitaires Catholiques de Mons Center for Operational Research and Econometrics,Louvain-la-neuve

国际会议

工业工程与系统管理2007年国际会议(International Conference on Industrial Engineering and Systems Management)(IESM 2007)

北京

英文

2007-05-30(万方平台首次上网日期,不代表论文的发表时间)