会议专题

Multi-period Two-echelon Integrated Competitive/Uncompetitive Facility Location with Elastic Customer Demand

This paper addresses the multi-period two-echelon integrated competitive/uncompetitive facility location problem in a distribution system design. Unlike most of past research, our study allows for dynamic planning horizon, distribution of commodities, configuration of multi-echelon facility, availability of capital for investment, competition existing in stores, customer choice behavior and storage limitation. This problem is formulated as a bi-level programming model and a mutually consistent programming mode, respectively. A genetic algorithm-based heuristic (GA) is presented and compared with random search solution and mutually consistent solution (MC) using numerical example. The computational results show that the GA approach is efficient and the values of the performance index were significantly improved relative the MC.

Facilities planning and design Genetic algorithm Multi-period Competitive Noncompetitive

Xuefeng WANG Xiaoming SUN Guangcun ZHANG

Department of Industrial Engineering,Shanghai Jiaotong University,Shanghai,Peoples Republic of Chin Shanghai business school,Shanghai,Peoples Republic of China

国际会议

工业工程与系统管理2007年国际会议(International Conference on Industrial Engineering and Systems Management)(IESM 2007)

北京

英文

2007-05-30(万方平台首次上网日期,不代表论文的发表时间)