MONITORING AND ASSESSMENT OF A FRAME TUNNEL BRIDGE DURING JACKING CONSTRUCTION STAGE

Jacking is the popular construction method of frame tunnel bridges. There are twoproblems should be solved in the jacking process. One is cracking caused by unbalancedjacking force between the both sides along the railway line,especially for slender frametunnel bridge. The other is cracking caused by different settlement,especially for bridge onsoft subsoil. In this paper the monitoring on a frame tunnel bridge (a structure located inTangshan city,Hebei province,China) is discussed. Before field monitoring a 3-D finiteelement model is created using MIDAS software and the mechanical behavior under differentload cases are analyzed. The critical points are identified and the concrete strain andtemperature at critical points are monitored during the jacking stage. The construction qualityof this tunnel bridge is guaranteed,and helpful advice is proposed for the design,constructionand prevention of cracks of the frame tunnel bridge.

tunnel bridges jacking concrete bridges monitoring assessment

Wenliang Lu Dan Su Dawei Dong

Department of Bridge Engineering,Beijing Jiaotong University,PR China

国际会议

The International Conference on Durability of Concrete Structures(2008年混凝土结构耐久性国际学术会议)

杭州

英文

1051-1057

2008-11-01(万方平台首次上网日期,不代表论文的发表时间)