会议专题

Problems of integration ISMC Calendar planning of mining and transport workswith the automated management system of geotechnological complex on surface mining

The paper considers the main problems of interaction of information software and methodical complex Calendar planning of mining and transport works with the software modules of the automated corporate management system of the geotechnologieal complex on surface mining of 《Dzhetygara》. The brand new is that due to the interaction of program and methodical complexes the reasonable relation,optimal technological,technical,organization and economic parameters of operation of mining and transport equipment can be already determined at the stage of scheduling.

open-pit mining and transport works calendar planning technologically stable period

S.Zh.Galiyeva A.A.Boyandinova Zh.A.Boyandinova

Mining Institute after D.A. Kunayev,BSE,Almaty,the Republic of Kazakhstan

国际会议

Seventeenth International Symposium on Mine Planning and Equipment Selection(MPES 2008)(第十七届矿山规划和设备选型国际研讨会)

北京

英文

793-797

2008-10-20(万方平台首次上网日期,不代表论文的发表时间)