会议专题

Method of optimization of timely plans of mining operations at opencasts

System of timely planning of mining operations at opencasts when mining of useful mineral materials may be classified as complex hierarchical dynamic system. Its includes the main system of annual planning of mining operations development-a set of methods and mathematical models,on the basis of which designs of mining operations are worked out,and also quarter-monthly and week-daily plans are formed.In the paper on the basis of a specific example problem of optimization of week-daily plans,mathematical models and algorithms are presented,which allow solving such problems as choice of optimal plans of ore shipment from opencast faces and re-loading storehouses of opencasts and preparation plants; choice places of re-loading storehouse location in working zones of opencasts; optimization of ore and overburden transportation from opencasts faces to re-loading storehouses by opencasts motor transport and so on. These mathematical model and software were tested in conditions of a number of large operating opencasts of the Republic of Kazakhstan. The tests showed high level of reliability and degree of details when worked-out mathematical models using.

opencast designing of mining operations quarter-monthly and week-daily plans mathematical models and algorithms opencast faces and re-loading storehouses

Dias G.Bukeikhanov Mukhamedzhan M.Turdakhunov Batyrkhan Zh.Bekmuzayev Daultkhan A.Beiseitov

National Center on Complex Processing of Mineral Raw Materials,RSE Almaty,Rudnyi,the Republic of Kaz NPO SSGPO JSC Almaty,Rudnyi,the Republic of Kazakhstan

国际会议

Seventeenth International Symposium on Mine Planning and Equipment Selection(MPES 2008)(第十七届矿山规划和设备选型国际研讨会)

北京

英文

591-596

2008-10-20(万方平台首次上网日期,不代表论文的发表时间)