Simultaneous optimization of final pit and production schedule in open-pit coal mines

A dynamic sequencing method has been developed that can simultaneously optimize the final pit and the production schedule of an open-pit coal mine. The method first establishes a geological seam model of a bedded coal deposit which estimates the relevant attributes of coal seams at the center of each block on the X-Y plane. Based on the seam model,a sequence ofgeologically optimum final pits is generated and,in each of these pits,a sequence of geologically optimum push-backs is generated. The geologically optimum push-backs are then put into a dynamic programming scheme and the best production schedule which has the highest NPV is obtained for each final pit. After the best production schedules for all the final pits are obtained,the one with the highest overall NPV is the optimum final pit and its associated best schedule is the overall best production schedule.

optimization final pit production schedule dynamic programming

Xiaowei Gu Qing Wang Youyi Zheng Bing Zhang Shu Ge

College of Resources and Civil Engineering,Northeastern University,Shenyang,Liaoning 110004,PRC

国际会议

Seventeenth International Symposium on Mine Planning and Equipment Selection(MPES 2008)(第十七届矿山规划和设备选型国际研讨会)

北京

英文

395-401

2008-10-20(万方平台首次上网日期,不代表论文的发表时间)