Optimal mining development algorithm on the adjacent sites of the quarry field

The sites with the least stripping rate on the stretched gently dipping coal field are developed first of all.After commissioning the first priority site at the expiration of a certain period for decreasing the value of stripping current rate and increasing the production capacity of the quarry an adjacent site is drawn into operation. Here the extensions of the developed area on the first priority site allows transferring to lower rock mass recovery by excavation dump technological complexes with shifting it into the internal dumps.

gently inclined deposits sites internal dumps stripping coefficient excavation dump technological complexes

Bayan Rakishev Serik Moldabayev Zhainagul Khammetova

K.I. Satpaev Kazak National Technical University,Almaty,Kazakstan K.I.Satpaev Ekibastuz Engineering-Technical Institute,K.I.Satpaev Ekibastuz,Kazakstan

国际会议

Seventeenth International Symposium on Mine Planning and Equipment Selection(MPES 2008)(第十七届矿山规划和设备选型国际研讨会)

北京

英文

368-374

2008-10-20(万方平台首次上网日期,不代表论文的发表时间)