会议专题

Automated system for timely control of ores mining

When mining and processing ofpoly-metallic ores increasing of concentrates quality may be achieved by using rational coordination between mining and processing operations with due account of technological preparation characteristics of different types of ores. This coordination is carried out on the basis of scheduling week-daily (decade-daily) timetables of ore mining and shipment to a preparation plant. In the paper mathematical model of problem of operational scheduling is offered. It allows rationally coordination of ore flows from different opencasts faces,their accumulation on intermediate storehouses with consequent shipment them to a preparation plant under the rational time-schedule. This mathematical model was tested at Sokolovskiy opencast of the largest Kazakhstans mining enterprise-SSGPO JSC.The tests allowed increasing a concentrate yield,which is obtained from ore of this opencast.

automated system timely control poly-metallic ores mathematical model rational coordination between mining and processing operations

Stanislav I.Petrovitch Mazhit A.Faizulin Nataliya G.Stukalova Vera S.Muzgina

RSE National Centre on Complex Processing of Mineral Raw Materials of the Republic of Kazakhstan,A Gornoe buro LLP Almaty,The Republic of Kazakhstan

国际会议

Seventeenth International Symposium on Mine Planning and Equipment Selection(MPES 2008)(第十七届矿山规划和设备选型国际研讨会)

北京

英文

227-230

2008-10-20(万方平台首次上网日期,不代表论文的发表时间)