Case Studied for Sludge Application in Heating and Power Industry

The daily yield of sludge from wastewater treatment plant was about 300 tons.To solve this special waste is still key problem in Hefei.At present.there are two cycle fluidized bed ovens with capacity of 75t/h built for sludge treatment of Hefei.120 tons of sludge was treated per day by this method.Some experiences were obtained during operation.

sludge heating and power incineration

ZHAO Honghai HAN Guoxia TANG Chuanjiang Ye Shiying JIN Jie WU Ke

Hefei Heating and Power Company,Hefei 230001,China CETK Hefei University,Hefei 230022,China