会议专题

Four-Step Procedure of Micro-Siting in Wind Farm Projects

A four-step procedure of micro-siting in wind farm projects, as a solution of past projects, is presented. It is a method included four steps, “optimization at wind resources, adjustment from construction condition, inspection on environment target, and review with comprehensive consideration. Some relations in important factors are illustrated also.

wind turbine micro-siting wind farm project

Jianshe Yang

Beijing Hydroelectric of Investigation & Design Institute of CHECC,Aug.2007

国际会议

第四届全球风能大会暨2008北京国际风能大会

北京

英文

2008-10-29(万方平台首次上网日期,不代表论文的发表时间)