Minimizing Makespan at Module Assembly Shop in Shipbuilding
With the wide application of module shipbuilding mode,module spatial scheduling problems occur in various working areas and constrain the productivity of shipbuilding.It is a NPhard problem to obtain optimum scheduling due to the complex constraints.On the basis of investigation on the characteristics of module shape and processing technique,a heuristic module spatial scheduling algorithm meeting due dates,maximizing utilization of work plates and minimizing makespan is developed with the consideration of spatial and time constraints.Also,a target of spatiotemporal utilization ratio is proposed and used in improving the algorithm.With the algorithm,visual results of daily layouts and work orders can be easily obtained.The operation results using real shipyard data show that the module spatial scheduling performance and efficiency are satisfactory.
Spatial scheduling Makespan Spatiotemporal utilization ratio Shipbuilding
Junli Zheng Zhibin Jiang Senior Member Feng Chen Qiang Chen
Department of Industrial Engineering and LogisticsShanghai Jiao Tong UniversityShanghai,China Jiangsu Rongsheng Heavy Industries Group Co.,Ltd,Shanghai,China
国际会议
北京
英文
2008-10-12(万方平台首次上网日期,不代表论文的发表时间)