会议专题

Process Planning Dynamic Model Based on HOOPN for Top-downCollaborative Assembly Design

According to the characteristics of the design process of top-down collaborativeassembly design,process planning dynamic model based on HOOPN (hierarchical object-orientedPetri-net) is constructed for top-down collaborative assembly design.The outside and inside taskdependent relationships among the task groups include parallel,sequence and coupling areimplemented.The definitions of attribute for each element and the activation rules are presented forPetri-net.The fuzzy overall evaluation model is applied for risk evaluation of design process,andthe local and global risk level is determined.The whole process planning is adjusted and controlledbased on special risk decision-making mechanism.

dependent relationship process planning dynamic model supervision risk evaluation

Y.D.Yang Z.H.Li S.T.Zhang

Zhijing College,Zhejiang University of Technology,Zhejiang Hangzhou 310024,China;State Key Laborator College of Mechanical Engineering,Hangzhou Dianzi University,Zhejiang Hangzhou 310018,China State Key Laboratory of CAD&CG,Zhejiang University,Zhejiang Hangzhou 310058,China

国际会议

2008 International Conference on Advances in Product Development and Reliability(2008年产品开发与可靠性进展国际会议)

成都

英文

2008-08-04(万方平台首次上网日期,不代表论文的发表时间)