Information management model of construction schedule risk of high-speed railway project

Construction schedule risk of high-speed railway has the characteristics of latency, chain reaction and causality induced, thus the effective prevention and control of risk are the key issue of study on construction schedule management. Based on the analysis of subjective and objective factors of the construction schedule risk, information management model of construction schedule risk and risk-control system of construction schedule were established to achieve the purpose of whole course monitoring, effective decision-making and dynamic control.

high-speed railway construction schedule risk information management control

Weiqing LIU Tingru CHEN Wanbing WEI

School of Economics and Management,Shijiazhuang Railway Institute,Shijiazhuang 050043,China;School o School of Economics and Management,Shijiazhuang Railway Institute,Shijiazhuang 050043,China School of Mechanical Engineering,Shijiazhuang Railway Institute,Shijiazhuang 050043,China

国际会议

2008 International Conference on Risk and Relianility Management(2008风险与可靠性管理国际会议)

北京

英文

426-430

2008-11-10(万方平台首次上网日期,不代表论文的发表时间)