会议专题

Vertical U-tube Ground Heat Exchanger Design Method Research

Ground Heat Exchanger is the key component of Ground-Coupled Heat Pump system. But so far there is not a convenient,correct and suitable method to determine its length.In this paper,Typical Meteorological Year data was used to determine the hottest month,the coldest month and mean annual soil temperature.When the building load is known,the building hourly load can be obtained by introducing the concept of Equilibrium Temperature.Then,the cooling run fraction and the heating run fraction can be calculated.And a vertical U-tube heat exchanger length calculation example was given.In the end of this paper,vertical U-tube Ground Heat Exchanger design method was summarized.

Wang P Y Tian H F Cao W W

College of Mechanical Engineering,Shanghai University of Engineering Science,Shanghai 201620,P.R.Chi China Academy of Building Research Shanghai Branch,Shanghai 200023,P.R.China

国际会议

ICCR 2008 第四届国际低温与制冷工程大会

上海

英文

974-978

2008-04-05(万方平台首次上网日期,不代表论文的发表时间)