Retrofit Project of 2×100 MW Units in Yushe Power Plant,Shanxi Province Using Two Boilers-One CFB FGD

This paper takes the example of the retrofit of 2×100 MW units of Yushe Power Plant in Shanxi Province, and summarizes the applications of circulation fluid bed flue gas desulphurization (CFB-FGD) adopted two boilers one line in the retrofit of existing power plants.

CFB-FGD two boilers one line retrofit

LIN Fulin LIAN Egui

Fujian Longking Co.,Ltd,Fujian,PR China Fujian Longking Co.,Lid,Fujian,PR China