Economic Analysis of Wet Flue Gas Desulphurization Project Operation

After the flue gas desulphurization (FGD) of the #6 unit of Jiujiang Power Plant, the cost of electricity production is increased. This paper list the operation cost of FGD system and draw a conclusion that optimizing system design and operation management, and decreasing electrical consumption are critical to reducing the cost.

FGD Economic Analyze Operation Cost

DAI Yongyang SHU Yinggang