会议专题

Study of Risk Management Processing Model of Information System

Risk management processing model of information system is proved by five corporations and helps them get authentication such as BS7799-2. In this model there are four periods: plan, value risk, manage risk, analysis and improve. The plan period is the preparative time. Value at Risk is the maximum loss not exceeded with a given probability defined as the confidence level, over a given period of time. Manage risk, control the risk in order to reduce the loss and the cost. Authentication and analysis of risk case would help to improve the risk management processing.

Processing model risk management information management system Value at Risk

Gang CHEN

School of Economic and Management Tongji University School of information Management and Engineering Shanghai University of Finance and Economic

国际会议

2008 International Conference on Risk and Relianility Management(2008风险与可靠性管理国际会议)

北京

英文

465-468

2008-11-10(万方平台首次上网日期,不代表论文的发表时间)