会议专题

Research on Safety Risk Evaluation for Production-Post of Electricity Generation Enterprise

In this article the author unifies the thermal power production example, deeply analyzes the production-post and work of electricity generation enterprise, divides the risk into variable risk and invariable risk from the posts angel, and has established the risk assessment indicator system, has carried on the identification and the appraisal to the electricity generation production posts reality and the latent risk, has formulated controlling measures in advance to various posts of electricity generation enterprise, has realized the risk controlling management in advance of production post of electricity generation enterprise. This research has a useful value for the electricity generation enterprise to carry on risk controlling in advance of production post, and also has reference significance to other professions.

post analysis risk assessment risk controlling in advance electricity generation enterprise

GUO Zhaosong

School of Engineering,China University of Geoscience,Wuhan 430074,Hubei,China;Safety Production Department,China Huadian Corporation,Beijing 100035,China

国际会议

The 2008 International Symposium on Safety Science and Technology(2008年安全科学技术国际会议)

北京

英文

229-232

2008-09-24(万方平台首次上网日期,不代表论文的发表时间)