会议专题

Study on Activity-based Life Cycle Costing of Construction Project

The existing methods and models on Life Cycle costing dont solve the problem on calculation of construction cost,calculation of future operational and maintenance (O&M) cost and the theory base of life cycle costing.Activity-based life cycle costing of construction project is applied to every phase of construction project life.We can calculate construction cost,annual recurring future O&M cost,non-annual recurring future O&M cost and disposal cost with activity-based costing method in every phase.Then we can calculate life cycle cost The activity corresponding to above cost is divided into five levels: phase,category,element,task and activity.The process of activity-based costing consists of seven steps,and is an optimizing process continually.

Life cycle cost Activity-based life cycle cost Construction cost Future operational and maintenance cost

REN Guoqiang ZHANG Hongyan

School of Management,Tianjin University of Technology,P.R.China,300384

国际会议

2007 International Conference on Management Science and Engineering(2007管理科学与工程国际学术会议)

河南焦作

英文

150-155

2007-08-20(万方平台首次上网日期,不代表论文的发表时间)