Prediction Method of Construction Project Cost Based on Rough Sets and Unascertained Measure

There are many factors affecting the cost of building, some of the factors are related and redundant.We use Rough sets to reduce some related or redundant factors. Based on the ascertained measure and the cost of classical building, the cost of new Building can be predicted through similar weights and Exponential smoothing. The advantage of this method is that we can predict the cost of building through comparing with the representative and classical building cost. Using this method, we can predict the cost of objective building quickly、 effectively and accurately. It proves that the result we obtain is more reasonable.

Prediction method Construction Project cost Similar weight Unascertained measure Rough sets

SHI Huawang CAO Huishu

School of Civil Engineering School of Chinese Literature,Hebei University of Engineering,Handan,P.R.China,056038

国际会议

2008 International Conference of Management Science and Engineering(2008管理科学与工程国际学术会议)

河南焦作

英文

1139-1144

2008-11-01(万方平台首次上网日期,不代表论文的发表时间)