会议专题

THEORETICAL STUDY AND PRACTICE IN POWER SYSTEN ON RELIABILITY MANAGEMENT WITH LCC CONCEPT

Restructuring of power system needs progressive management. Shanghai Municipal Electric Power Company and East China Electric Power Grid Company, Ltd introduced life cycle cost (LCC) management concept into power system reliability control. By pilot study of GIS equipment retrofitting engineering decision for Taihe 220KVSubstation and Dou Shan 500KV substation, the Companies succeeded in combining LCC concept with reliability of network equipment and worked out a new method of equipment management in China power industry under market economy.

Life cycle: cost management: reliability control

Xue yulan Lili Han tianxiang

East China Electric Power Grid Company, Ltd. Shanghai 200002,China Shanghai Municipal Electric Power Company, Shanghai 200122,China East China Electric Power Test and Research Institute, Shanghai 200437,China

国际会议

the 3rd World Congress on Engineering Asset Management andIntelligent Maintenance Systems(第三届世界工程资产管理及智能维修学术大会)

北京

英文

1818-1822

2008-10-27(万方平台首次上网日期,不代表论文的发表时间)