会议专题

A GENERIC SPLIT PROCESS MODEL FOR ASSET MANAGEMENT DECISION-MAKING

Efficient asset management requires optimal decision making for asset repairs, renewal and replacement. Decisions concerning management of large-scale, long-lived engineering assets are made over a wide range of time scales. Strategic plans are made for periods of years while daily operational decisions may need to be made within a space of mere minutes. Furthermore, when making strategic decisions, we usually have the luxury of time to explore alternatives, whereas routine operational decisions must often be made with no time for reflection. Here we present an innovative split decision-making strategy which distinguishes meta-level decision making, i.e., deciding how to make decisions, from the information gathering and analysis steps required to make the decisions themselves.

Decision process Asset management Time scale Decision making

Yong Sun Colin Fidge Lin Ma

CRC for Integrated Engineering Asset Management, School of Engineering Systems, Queensland Universit Faculty of Information Technology, Queensland University of Technology, Brisbane, QLD 4001, Australi

国际会议

the 3rd World Congress on Engineering Asset Management andIntelligent Maintenance Systems(第三届世界工程资产管理及智能维修学术大会)

北京

英文

1444-1452

2008-10-27(万方平台首次上网日期,不代表论文的发表时间)