A Special Three-machine Production Scheduling with Stochastic Breakdowns
The problem of scheduling a three-machine flowshop, where machines suffer random breakdowns,is addressed with respect to the makespan objective. For our problem, obtaining an optimal schedule by implicit enumeration techniques (after dominance relations are established) is very hard, mainly due to the total idle time on machine 3. That is because it is the maximum of n terms, each of which includes the difference of two random sums of random variables, and furthermore, the terms are dependent. A dominance relation for minimizing makespan with probability 1 is established in the flowshop where machines suffer random breakdowns and processing time of the middle machine is equal. Furthermore, it is shown that Szwarcs algorithm for the deterministic problem stochastically minimizes makespan when random breakdowns are present.
flowshop machine breakdowns makespan realization algorithm.
Yang Li Fanhui Zeng
Shenyang Institute of Chemical TechnologyShenyang, China College of Science Liaoning Technical University Fuxin, China
国际会议
2007 Conference on Systems Science, Management Science and System Dynamics(第二届系统科学、管理科学与系统动力学国际会议)
上海
英文
1247-1252
2007-10-19(万方平台首次上网日期,不代表论文的发表时间)