Study on the Pollution Situation Caused by Chrome Residue Contaminated Sites and Integrated Remediation Plan

Definition and management of contaminated sites is introduced briefly by contrast to that in china. A typical chrome residue contaminated sites were selected according to certain methodology. We analyzed the polluted sites by filed sampling and found the soil and groundwater had been polluted by chromic(VI). The amount of chrome residue contaminated soil is about 205 thousands cubic meters. It is estimated about 14 million cubic meters contaminated sites need remediation in china. We also analysis the situation of chrome residue pollution in china and propose the objective and major tasks of national chrome residue contaminated sites integrated remediation plan.

contaminated sites chrome residue integrated remediation plan

WANG Xing-run LI Li LIU Yu-qiang WANG Qi

Chinese Research Academy of Environmental Sciences,Beijing 100012,China

国际会议

The 3rd International Conference on Waste Management and Technology(第三届固体废物管理与技术国际研讨会)

北京

英文

497-502

2008-11-05(万方平台首次上网日期,不代表论文的发表时间)