会议专题

Method for determining optimal number of suppliers under risk control

The purpose of the paper is to present an effective method to determine the optimal number of suppliers considering the risk control and cost control.Two risk events are considered: common risk event and individual risk event.The probabilities of these events,the financial loss caused by disasters,and the operating cost of working with multiple suppliers are considered in the analysis.An expression which could calculate the optimal number of suppliers is obtained.The numerical examples prove the rationality of the method and analysis the sensitivity of the optimal number to the factors.

supplier number risk event risk probability sensitivity

Jin QIN Li-xin MIAO Feng SHI Lian-bo DENG

School of Traffic and Transportation Engineering,Central South University,Changsha 410075;Research C Research Center for Logistics,Graduate School at Shenzhen,Tsinghua University,Shenzhen 518055 School of Traffic and Transportation Engineering,Central South University,Changsha 410075

国际会议

The 2008 International Conference on Business Intelligence and Financial Engineering(BIFE 2008)(商业智能和金融工程国际会议)

长沙

英文

834-839

2008-10-28(万方平台首次上网日期,不代表论文的发表时间)