会议专题

Establishment and Practice of the Monitoring and Evaluation Indexes System for Management of the Field Canal Projects

In order to appraise the advantages and disadvantages of managements for the field canal projects in an irrigation district (ID),integrated the improvement and rehabilitation of IDs,the monitoring and evaluation(M & E) networks and the indexes system for management of the field canal projects have been constructed by selected 120 fixed sampling lateral canals and 800 farmer households distributed in nine IDs in Guanzhong Plain of Shaanxi Province and have continually worked for six years (2000 to 2005),by tracing the fixed sampling investigation,collecting the basic information,analyzing and evaluating the whole regional monitoring data.These M & E network and the indexes system were basically reasonable,proved by the practice and can be supplied to other irrigation districts for references.

management of the field canal project the M & E networks the index system of the M & E Guanzhong Irrigation District(GID) of Shaanxi Province

Wang Mixia Wang Zhinong Shang Hujun Hu Xiaotao Cao Hongxia

Key Laboratory of Agricultural Soil and Water Engineering in Arid and Semiarid Areas of Ministry of Key Laboratory of Agricultural Soil and Water Engineering in Arid and Semiarid Areas of Ministry of Key Laboratory of Agricultural Soil and Water Engineering in Arid and Semiarid Areas of Ministry of Key Laboratory of Agricultural Soil and Water Engineering in Arid and Semiarid Areas of Ministry of Key Laboratory of Agricultural Soil and Water Engineering in Arid and Semiarid Areas of Ministry of

国际会议

International Conference on Effective Utilization of Agricultural Soil & Water Resources and Protection of Environment and the 4th Annual Academic Conference of Chinese Society of Agricultural Soil and Water Engineering

南京

英文

347-352

2006-08-16(万方平台首次上网日期,不代表论文的发表时间)