APPROACH OF MANAGEMENT PLANNING IN CONSTRUCTING HIGH-QUALITY CROSS-SEA BRIDGE
In this paper, several essential problems currently existing in the construction of cross-sea bridges in China have been addressed. Based on the construction management planning of the Hong Kong-Zhuhai-Macau Bridge, the compilation of series of life-cycle standard system, design theory and methods, determination of agreement mode, construction technology, key techniques, special equipment, preparation of resources and supervision policies etc have been studied. Some management planning approaches for improving the construction level of the cross-sea bridges have been discussed systematically.
Cross-sea Bridge Planning management Standard system Design idea
Quan-Ke Su Jin-Wen Zhang
College of Civil Engineering and Architecture, Central South University, Changsha 410075,P.R. China Hong kong-Zhuhai-Macau Bridge Advance Work Office, Guangzhou 510101, P.R. China
国际会议
第十届国际结构工程青年学者研讨会(The Tenth International Symposium on Structural Engineering for Young Experts)
长沙
英文
1379-1384
2008-10-19(万方平台首次上网日期,不代表论文的发表时间)