In-situ wave velocity test is an effective method to obtain shear wave and compressional wave velocities,and to solve problems encountered in engineering application such as computation of geotechnical parameters,classification of rocks and soils,and site zoning,etc.,Wave velocity test in a single drillhole was employed to derive valuable data for the construction of Beijing subway Line 8.Taking the 34-meter-deep drillhole ZK17 as an example,shear wave and compressional wave velocities,and dynamic mechanic parameters identified from wave-velocity test were analyzed in detail,furthermore,soils in the depth range of 34m were classified into two categories as follows,moderate stiff soil and moderate soft soil.Based on this valuable information,Beijing subway Line 8 is now being constructed in a safety situation.

wave velocity test shear module elastic module Beijing subway

Lingzhi Pan Changchun Zou Yaowen Zhang Bo Huang

Key Laboratory of Geo-detection China University of Geosciences,Beijing,Ministry of Education,Beijing 100083,China

国际会议

The 3rd International Conference on Environmental and Engineering Geophysics(第三届环境与工程地球物理国际会议)

武汉

英文

622-625

2008-06-15(万方平台首次上网日期,不代表论文的发表时间)