会议专题

A New Method of Monitoring Process Disturbance Based on Integrated SPC/EPC

Special reason and common reason bring on the process disturbance. Statistical process control (SPC) is commonly used to monitor the process disturbance which arises from assignable reason. Engineering process control (EPC) compensates the deviation of output for common reason based on the feedback adjustment principle. Therefore, integrated SPC/EPC approach has better performance than that merely using SPC or EPC. However, in practice, it is very hard to search the appropriate method to apply for integration of SPC/EPC. The main reason is that EPCs compensation has depressed probability which assignable reason is monitored by control chart. In this paper, a joint-monitoring method is designed to account for the above problems through detecting process output as well as monitoring process input. An example is given to prove that joint-monitoring can detect the process disturbance more quickly and more accurately.

SPC EPC Process disturbance Integrated SPC/EPC

Wang Xiuhong Li Quanqing

School of Management Science and Engineering,Zhengzhou Management Institute of Aviation Industry,Zhengzhou,P.R.China,450015

国际会议

The 15th International Conference on Industrial Engineering and Engineering Management(IE&EM2008)(第十五届工业工程与工程管理国际学术会议暨中国机械工程学会第11次工业工程年会)

郑州

英文

2008-09-20(万方平台首次上网日期,不代表论文的发表时间)