A Study on Earned Value Method for Uncertain Parameters in Project Integration Control

As traditional Earned Value Method doesnt take the uncertainty of planned index into consideration, this paper combines Earned Value Method with general theories of statistics, introduces the ways of dealing with uncertain information to earned value analysis and puts forward with Earned Value Method of uncertain parameters. By analyzing the statistical regularity of the cost-schedule in work procedure, establishing the control range of project cost-schedule plan, and then obtaining more objective assessing information based on the actual implementation of projects, this method improves the scientific rationality of planned implementation evaluation while expanding the functions of earned value analysis.

project management Earned Value Method uncertainty

Chang Qing Ji Gedi Li Bao

School of Management, Inner Mongolia University of Technology, Huhhot, P.R.China 010051

国际会议

The 15th International Conference on Industrial Engineering and Engineering Management(IE&EM2008)(第十五届工业工程与工程管理国际学术会议暨中国机械工程学会第11次工业工程年会)

郑州

英文

2008-09-20(万方平台首次上网日期,不代表论文的发表时间)