The Comprehensive Post-Evaluation of Logistics Centre Projects Social and Economic Benefits Based on FAHP
This paper proposes using fuzzy analytic hierarchy process (FAHP) for the comprehensive comprehensive post-evaluation of logistics centre project is constructed based on the features of logistics centre project. Then the hierarchical structure and the comprehensive evaluation model are built with FAHP method. After that, this paper discusses the weights setting of the indexes in the model, as well as data processing and the matrix of comprehensive evaluation. The final evaluation result of a case study is obtained. This method reduces the influence of subjective factors for a more rationa1evaluation.
Logistics Centre Projects Social and Economic Benefits Post-evaluation FAHP
Li Yumin Li Ke
School of Management Engineering, Zhengzhou University, Zhengzhou, P.R.China, 450001
国际会议
郑州
英文
2008-09-20(万方平台首次上网日期,不代表论文的发表时间)