会议专题

The Research of Risk Evaluation of Agent Construction Project based on Group AHP

Agent construction system is a new project management mode to meet the need of modern engineering construction, and is an innovation of government investment engineering management mode. There are some positive aspects and some risks during the implementation .This paper analyses the risk factors based on the agent construction system with projects characteristics, establishes risk indicator system, utilizes AHP and group decision-making methods to measure the weights of these factors, calculates the risk degrees with Delphi technique which considers the experts trust, and finally, the paper gives an example to show how to use this method. This paper sets up a reasonable and effectively method for projects risk management with agent construction system.

Group AHP Agent construction system Risk evaluation

Wang Ailing Sun Shaonan Feng Xiaoling

School of Management Engineering, Zhengzhou University. Zhengzhou 450001, Henan, China School of Water-Conservancy,North China Institute of Water-Conservancy and Hydroelectric Power.Zheng

国际会议

The 15th International Conference on Industrial Engineering and Engineering Management(IE&EM2008)(第十五届工业工程与工程管理国际学术会议暨中国机械工程学会第11次工业工程年会)

郑州

英文

2008-09-20(万方平台首次上网日期,不代表论文的发表时间)