会议专题

Expansion from 18 Mtons to 36 Mtons at the Aitik Concentrator

The Aitik copper mine is located in the north of Sweden and the concentrator at the mine started its operation in 1968 with a capacity of 2 Mton ore per year.Since then the operation has expanded several times,and today the capacity is 18 Mton ore per year.A new expansion plan was investigated in 2005,however the building of a new concentrator was found to be a better solution,giving a lower cost,a longer lifetime and more concentrates to the smelter at the coast.Several choices have been evaluated regarding the location of the concentrators crushing,grinding,dewatering,process control and water systems.The energy cost comparison has been an important factor when evaluating the various choices.The single most important decision has been in choosing the grinding system.Once again the fully autogenous grinding system,favoured by Boliden,has proven to be the best solution.The location of the mill,high and near the tailing pond,gives lower transportation costs for the ore and railings,compared to other locations.A new water system will lower the pumping cost,give better control of water circulation to the plant and create fewer problems with permafrost in the tailings disposal area.Molybdenum recovery will be installed in the new plant using a separate circuit.A gold leaching plant was also investigated.Gold leaching is planned for the pyrite concentrate from the chalcopyrite/pyrite separation and the concentrate from the desulphurisation circuit that will be installed on the bulk flotation tailings.

Flotation Grinding Dimensioning Copper

N.J.Bolin H.J(o)nsson

Boliden Mineral AB,Boliden,Sweden

国际会议

XXIV International Mineral Processing Congress(第24届国际矿物加工大会)

北京

英文

4165-4170

2008-09-24(万方平台首次上网日期,不代表论文的发表时间)