会议专题

Study on Project Duration Risk Based on Unascertained-PERT

When the computation of project duration, the unascertained factor of project duration was leave out in traditional PERT network. And the computing result is a determined value. The determined result of project duration can not include the complete information, and usually can not match the project fact. In this paper, the uncertainty of project network is studied by unascertained number algorithm. And the project duration is contract with the credence. Firstly, the uncertainty of project duration is studied in the PERT network. Secondly, the unascertained number of the project duration in the network is determined by using the unascertained algorithm. Thirdly, both the finished credence and the accumulate credence can be worked out by the unascertained algorithm in the unascertained finish time of the network-planning. Comparing with traditional PERT, the unascertained PERT is more scientific in the project practice. Finally, the availability and scientific of the unascertained PERT were proved by a case study.

PERT Unascertained Number, Project Duration Duration Risk Credence

Ma lihua Wang Aifeng Yan Huizhe

School of Economics and Management, Hebei University of Engineering, Handan, P.R.China, 056038

国际会议

The 15th International Conference on Industrial Engineering and Engineering Management(IE&EM2008)(第十五届工业工程与工程管理国际学术会议暨中国机械工程学会第11次工业工程年会)

郑州

英文

2008-09-20(万方平台首次上网日期,不代表论文的发表时间)