Construction of Early Warning System for Integrated Engineering Risk Based on Life Cycle
The early warning system for engineering risk is an effective means to prevent and control risk, which will be helpful to decrease the lost as early as possible. According to the characteristics of engineering risk, this paper presents the construction of the integrated risk warning system based on engineering life-cycle. There are five subsystems including risk identification, risk analysis, risk early warning, risk solution and risk re-evaluation. A case in Handan is given in the paper, with the help of the information technology (GIS) and the mathematical models (The Unascertained Measuring Model). The paper aims at improving the risk early warning system, to make it more scientific and reliable.
engineering risk life cycle integrated risk early warning system
Zhang-lin GUO Yan LUO
Economics Management Institute, Hebei Engineering University, Handan, 056038
国际会议
The 1st International Conference on Risk Analysis and Crisis Response(首届风险分析与危机反应国际学术研讨会)
上海
英文
843-847
2007-09-25(万方平台首次上网日期,不代表论文的发表时间)