Two-Polar Concept of Project Risk Management (TPCRM)
The state-of-the art of Risk Management Process (RMP) mostly relied on two main phases,(a): Risk Assessment (RA) and (b): Risk Response (RR) Most of these studies have had a significance emphasis on the RA but we can find a limited study on the subject of the RR. So,the main objective of this research study is to emphasize on the indispensable shift of our perspectives at the present time to a more Equilibrant RMP,both for RA and RR. Based on this view,this paper proposes a two-polar generic RMP framework for projects and introduces some new elements. It can be concluded that a two-polar perspective proposed in this research study can be used for risk management projects in most effective and productive manner in real worlds problems.
Risk Management Project Risk Management Risk Response Risk Management Process
Seyed Mohammad Seyedhoseini Siamak Noori Mohammad Ali Hatefi
Industrial Engineering department,Iran University of Science and Technology,Narmak,Tehran 16846_13114,Iran
国际会议
The First International Conference on Management Innovation(ICMI 2007)(管理创新会议)
上海
英文
485-490
2007-06-04(万方平台首次上网日期,不代表论文的发表时间)