The Installation & Testing of the Fog Inlet Air Cooling System for the Yazd Combined Cycle Power Plant

Gas turbines are almost constant volume machines at a given constant shaft speed. On the other hand, the gas turbine output power depends strongly on the inlet air mass flow rate. Therefore, the available output power considerably reduces when the air density decreases at high ambient temperatures. The solution of this problem is very important because the peak demand season also happens in the summer. In Iran, various inlet air cooling systems are used in power plants to overcome this problem. In this paper, the different inlet air cooling systems are reviewed and the fog system is selected as the best alternative for the Yazd combined cycle power plant. This system is installed and commissioned in Yazd power plant in the spring of 2006. The test results of this system at 38 ℃ and 7% relative humidity have shown an average power increase of 10.6 MW (11.8%) for the gas turbine No.1 and 10.9 MW (12.1%) for the gas turbine No.2. The economical study has shown that this system is very cheap in comparison with the installation of new gas turbines.

Fog Inlet air cooling Gas turbine Power enhancement

Mohammad Ameri Saeed Seif Mohammadi Heidar Roohi

Combined Heat & Power Specialized Unit, Energy Eng. Department, Power & Water University of Technology, P.O. Box:16765-1719, Tehran, Iran

国际会议

2007杭州国际动力工程会议(The International Conference on Power Engineering 2007)

杭州

英文

2007-10-23(万方平台首次上网日期,不代表论文的发表时间)