Study on Several Problems of Load Dump Test on Lunnan Gas Turbine Power Plant

Through load dump tests on Lunnan power plant, it is found that there exist several problems to the dynamic control haracteristic of new generator sets of gas turbine, such as high dynamic response speed of MARS No.2 generator set, large speed overshoot and excessive speed of TITAN-130 generator set. In this paper, the potential reasons for the problems above are analyzed, and some corresponding improving measures are put forward according to the actual condition of electric power pool and generator units.

Load dump Control system Response speed Speed overshoot