会议专题

Pilot Study on AmOn Integrated Bioreactor for Wastewater Treatment

The pilot-scale study on AmOn integrative process was discussed in this paper. The results showed that AmOn integrative process had high efficiency on CODCr and NH4+-N removal, and the CODCr and NH4+-N removal rate were 80% and 89.5%, respectively. But the TN and TP removal rate were low, 22% for TN and 47.8% for TP. The concentration of CODCr, NH4+-N, TP in effluent were below 40mg/L, 6mg/L, 0.9 mg/L respectively, satisfying the first B level standard of “discharge standard of pollutants for municipal wastewater treatment plant(GB 18918-2002). As well, the reason for low removal efficiency of TN and TP were analyzed, supporting for the further experiment and process optimization. AmOn integrative process had widespread prospect for application and high value for further research.

wastewater treatment AmOn integrated bioreactor nitrogen and phosphorus removal

LI Yanfei ZHANG Yalei CHEN Ling ZHAO Jianfu LIU Changqing WU Yong ZHENG Yong

State Key Laboratory of Pollution Control and Resource Reuse, College of Environmental Science and E College of Environmental and Municipal Engineering, Qingdao Technological University, Qingdao 266033 Shanghai Dayuan Environment Science & Engineering Co. Ltd, Shanghai 200092, China

国际会议

2007环境科学与技术国际会议(The 2007 International Symposium on Environmental Science and Technology)

北京

英文

2007-11-13(万方平台首次上网日期,不代表论文的发表时间)