会议专题

FAILURE ANALYSIS ON ELBOW TUBE IN PETRO-CHEMICAL PLANT

The elbow tube was found to have leakage. The immediate action was to cover the leakage region with black tar material and clamped metal sheet to protect the liquid flowing out from the leakage. However, after long period of operation the leakage still occurs. It was dismantled from the plant on 10 December 2005. The leakage pipe was sent to MINT Material Laboratory for investigation on 13 Mac 2006. When the clamp metal sheet and black tar material was removed, it was found a large hole on the tube. This paper describes the results of investigation that was performed to determine the cause of the failure.

Hafizal Yazid Mohd B. Harun Zaiton Selamat Shariff Sattar Muhamad Jalil

Nuclear Malaysia, Bangi, 43000 Kajang, Selangor,Malaysia.

国际会议

第九届工程结构完整性国际会议(The Ninth International Conference on Engineering Structural Integrity Assessment)

北京

英文

2007-10-15(万方平台首次上网日期,不代表论文的发表时间)